A project has the following cash flows:
Project Cash Flows | |
Time (yrs) | Cash flow ($) |
0 | -400 |
1 | 0 |
2 | 500 |
The required return on the project is 10%, given as an effective annual rate.
What is the Internal Rate of Return (IRR) of this project? The following choices are effective annual rates. Assume that the cash flows shown in the table are paid all at once at the given point in time.